| 1. | Fuzzy modeling and optimization algorithm on dynamic economic dispatch in wind power integrated system 含风电场电力系统经济调度的模糊建模及优化算法 |
| 2. | The result of load forecasting has become on important basis for operating management , economic dispatch , increasing system ' s capacity , and pursuing power market 负荷预报结果已成为运行管理、经济调度、系统增容、推行电力市场的重要依据。 |
| 3. | The hydrologic forecasting is the basis of the economic dispatching of multi - reservoir system . precise prediction is the key to ensure the success of optimal dispatching 径流预测作为水电站优化调度的基础,其预报结果的准确与否,将成为水电站的最优调度方式能否发挥作用的关键。 |
| 4. | J . p . chiou , and c . f . chang , 2006 , “ dynamic economic dispatch using variable scaling hybrid differential evolution ” , proceedings of the national conference on modern electrical engineering technologies , pp . 143 - 148 张宗福,邱机平,张英彬, ”应用蚁群演算法于配电系统之最佳化电容器配置” ,第十一届人工智慧与应用研讨会。 |
| 5. | With the expanding of the power system , power plants are far away from each other geographically , and the network loss caused by power transmission among power plants must be considered during economic dispatch and control 随着电力系统规模的扩大,各发电厂在电力系统中的地理位置相距较远,在进行经济分配时,则必须考虑电厂间输电线传送功率所带来的网络中的有功功率损耗。 |
| 6. | Based on the day - schedule , short - term load forecast , and monitoring program for spinning reserve , the economic dispatch of east china power grid can be realized , which can ensure time margin for load balancing 在日计划编制的基础上,结合超短期负荷预计及旋转备用监视程序,对华东电网各省市的口子及直属电厂实行经济调度,使调度在进行出力及负荷平衡时有一定时间裕度及科学依据。 |
| 7. | Economic dispatching of series hydroplant system plays an important role for optimal operation of power grid . appropriate scheduling of the series hydroplants is vital to the security , stability and economic operation of the whole power system 梯级水电站群经济调度是电网优化运行的重要组成部分,正确、合理的安排梯级水电站群的运行方式对整个电网的安全、稳定、经济运行至关重要。 |
| 8. | The system has functions of disposing data , analyzing the cost of the production of electric power , economic dispatch , analyzing the economic of operational state , helping to make decisions for the bidding for pool purchase and so on 论文主要构建了火力发电厂生产成本动态监测系统的整体框架,主要包括数据处理、发电成本分析、发电负荷经济分配、运行状态经济性分析、竞价上网辅助决策等功能。 |
| 9. | Good interface makes it more easy to use and spread . the software has used dynamic programming which is skilled . it can process unlimited short term economic dispatch under the conditions of all the machines " fix time is planed beforehand 本论文在深入研究分析潮汐电站优化调度的基础上,还采用了面向对象的编程工具vb ,编制了通用的潮汐电站优化调度程序,使程序具有良好的用户界面,方便用户的使用和软件的推广。 |